Année de construction: 2022
Surface d‘eau:
- Zone de baignade: 36 m²
- Surface totale: 36 m²
Profondeur d‘eau: 1,5 m
Autre:
©Carolin Tietz
Conception et réalisation:
Schleitzer baut Gärten creativ & innovativ GmbH
DE-80999 München
The wish for a new design of the Swimming Pond, which was already getting on in years, was the customer‘s motivation to contact us again. A complete renovation of the Swimming Pond became the goal of the project. The dry-installed pumps were replaced by the new technical components, an underfloor roller blind was integrated into the swimming area and new recreation areas were created from the regeneration area. During a sauna session, let your gaze wander into nature as well as over the Living Pool and forget the stressful daily work routine for a moment. An outdated Swimming Pond that required a lot of maintenance has been transformed into an energy-efficient, modern wellness area for young and old.