Swimming next to the koi carp

swimming-next-to-the-koi-carp-merelbeke

Informations techniques


Année de construction: 2020
Surface d‘eau:
- Zone de baignade: 60 m²
- Zone de régénération: 74 m²
- Surface totale: 134 m²
Profondeur d‘eau: 1,4 m
Liner: gris foncé
Autre:
The project consists of 2 parts. 1. living pool (technology see above) 2. fish pond with bio compact filter V50, 10 m² biofilter and pump skimmer.

Conception et réalisation:
Hoveniers­gebroeders bvba
BE-9890 Gavere

Swimming next to the koi carp


An old combined koi carp and swimming pond was separated into a Living Pool with a regeneration zone and a separate pond for the koi carp.The old combination was not a successful option, the algae problem also being very dominant, so we converted these ponds into two separate systems. The 5 x 12 metre Living Pool was covered with dark grey PVC liner and is attached to a regeneration zone and Biofilter behind it. In the swimming zone, a solar roll cover made of polycarbonate provides a cover but also protection for the children from the deeper part of the pool. If you compare the before and after, you can see an impressive difference.


swimming-next-to-the-koi-carp-merelbeke-detail
swimming-next-to-the-koi-carp-merelbeke-2
swimming-next-to-the-koi-carp-merelbeke-before

commande de catalogue



voir les vidéos