Rehabilitation from Biotop to Biotop

Renovation and reconstruction of a swimming pond with stones and plants.

Informations techniques


Année de construction: 2021
Surface d‘eau:
- Zone de baignade: 50 m²
- Zone de régénération: 50 m²
- Surface totale: 100 m²
Profondeur d‘eau: 1,5 m
Liner: vert
Autre:
110W Premium UVC Lamp Complete Set

Conception et réalisation:
Garten- und Landschaftsbau Kreye GmbH & Co. KG
DE-27777 Ganderkesee

Rehabilitation from Biotop to Biotop


An existing natural biotope was converted into a large Biotop Swimming Pond. A lot of emphasis was put on natural construction. In addition, only native or existing materials were used. Sunbleak fish multiply among native water plants, which the kingfisher enjoys for breakfast in the morning.


A curved swimming pond in the garden surrounded by flowers and stones
The Swimming Pond of Biotop adapts to the nature
Natural pond built with native materials in the garden

commande de catalogue



voir les vidéos