Année de construction: 2020
Surface d‘eau:
- Zone de baignade: 32 m²
- Zone de régénération: 30 m²
- Surface totale: 62 m²
Profondeur d‘eau: 2,0 m
Liner: bleu
Autre:
Premium UVC lamp complete
Conception et réalisation:
Schleitzer baut Gärten creativ & innovativ GmbH
DE-80999 München
A Swimming Pond was built in the middle of the city, which was to be well integrated into the existing garden with its large number of trees. Despite the natural appearance, we succeeded in equipping the Swimming Pond with an underfloor roller blind and an air heat pump. This makes it possible to make the most of the bathing season and the associated bathing pleasures. You are also welcome to use the floating steps to linger and let your feet dangle in the regeneration area. The wooden deck directly at the Swimming Pond with its charming pergola invites you to linger on warm summer days. For cooler or more unstable days, a garden pavilion has been integrated, from which you get another perspective onto the garden space.