Année de construction: 2021
Surface d‘eau:
- Zone de baignade: 30 m²
- Zone de régénération: 30 m²
- Surface totale: 60 m²
Profondeur d‘eau: 1,5 m
Liner: bleu
Autre:
© Mina Al Samarriy
Conception et réalisation:
John GmbH
DE-96103 Hallstadt
A Swimming Pond in a historic urban setting with a natural garden, which, despite being difficult to access, creates a peaceful, green oasis in the middle of the city.