Informations techniques


Année de construction: 2018
Surface d‘eau:
- Zone de baignade: 25 m²
- Zone de régénération: 20 m²
- Surface totale: 45 m²
Profondeur d‘eau: 1,8 m
Liner: gris clair
Autre:

Conception et réalisation:
Fuchs baut Gärten GmbH
de-83661 Lenggries

Renovated swimming pond with diving stone


A roughly 20-year-old pond was converted into a Swimming Pond. The requirement was to maintain the location and shape of the old pond as much as possible so as not to alter the overall appearance of the garden too much. Our goal was to create a Swimming Pond offering enough length and depth for swimming and diving on the one hand as well as a shallower area with steps leading into the deeper swimming section on the other. The two sitting areas (a wooden deck on the one side and a stone terrace on the other) create two separate spaces that allow the Swimming Pond to be used from both sides. A further access point is the “diving rock” (a large slab of rock at the edge of the swimming area from which one can dive into the deep water).



commande de catalogue



voir les vidéos